Project Limits
Flagler Street to NW 25th Street
Project Summary
The intent of the project is to enhance the area by: widening the roadway and reconstructing the median at various locations; paving an out-of-service railroad track at NW 72nd Avenue and NW 22nd Street; rebuilding curb ramps and driveways to meet Americans with Disabilities Act (ADA) standards; replacing sections of the sidewalk and curb & gutter at various locations; upgrading traffic signs; and repaving and re-striping the roadway. Once completed, this work will improve the smoothness of the pavement and enhance safety throughout the corridor for motorists and pedestrians.
Start Date: June 2008
Completion: January 2009
Construction Cost: $2.1 million
Project Team:
FDOT South Miami-Dade Resident Engineer
Mario Cabrera, P.E.
FDOT Project Engineer/Administrator
Farhang Esmailzadeh
Contractor
General Asphalt Co., Inc.
Public Information
Monica Diaz