Biscayne Boulevard / US 1 (SR 5) Roadway
Improvement Project

FIN No.414623-1-52-01
WPI No. N/A

 

SR933 Road SignProject Limits

SE 2nd – NE 5th Street

 

Project Summary

The intent of the project is to enhance the area by: rebuilding curb ramps to meet Americans with Disabilities Act (ADA) standards; replacing sidewalk and curb & gutter at various locations; upgrading traffic signs and signals, as well as pedestrian signals; cleaning storm water drainage inlets; minor widening; and repaving and re-striping the roadway.

 

Start Date: August 2008

 

Completion: Spring 2009

 

Construction Cost: $2.9 Million

 

Project Team:

FDOT North Miami-Dade Resident Engineer

Ivan Hay, P.E.

 

FDOT Project Manager

Amanda Shotton, P.E.

 

Construction Engineering & Inspection

Carnahan Proctor & Cross / Tamayo Engineering

 

Contractor

Community Asphalt Corp.

 

Public Information

Monica Diaz
305.499.2410
Monica.Diaz@dot.state.fl.us