Biscayne Boulevard / US 1 (SR 5) Roadway
Improvement Project
FIN No.414623-1-52-01
WPI No. N/A
Project Limits
SE 2nd – NE 5th Street
Project Summary
The intent of the project is to enhance the area by: rebuilding curb ramps to meet Americans with Disabilities Act (ADA) standards; replacing sidewalk and curb & gutter at various locations; upgrading traffic signs and signals, as well as pedestrian signals; cleaning storm water drainage inlets; minor widening; and repaving and re-striping the roadway.
Start Date: August 2008
Completion: Spring 2009
Construction Cost: $2.9 Million
Project Team:
FDOT North Miami-Dade Resident Engineer
Ivan Hay, P.E.
FDOT Project Manager
Amanda Shotton, P.E.
Construction Engineering & Inspection
Carnahan Proctor & Cross / Tamayo Engineering
Contractor
Community Asphalt Corp.