Project Summary
The Florida Department of Transportation (FDOT) District Six is designing construction plans for a project in Miami-Dade County, as follows:
- Repaving the road and upgrading signage and pavement markings
- Restriping travel lanes and adding about 2.5 feet of new pavement to accommodate paved shoulders along both sides of the road which could serve as bicycle lanes
- Upgrading pedestrian ramps
- Installing missing sections of sidewalk along the east side of SW 57 Avenue from Murcia Avenue to Salvatierra Avenue and along the west side of SW 57 Avenue north and south of SW 35 Street; from SW 28 Street to SW 27 Street; and south of SW 24 Street
- Installing new outside railings on the bridge between SW 35 Street and SW 34 Street and improving the sidewalk along the east side of the bridge
- Installing new drainage structures at localized sections of the swale to minimize flooding
- Replacing existing four palm trees south of Sevilla Avenue with new shade trees at a new location within the project limits
Project Team
FDOT Design Project Manager
Ana Arvelo, P.E.
Public Information Specialist
Marta Rodriguez
Bermello Ajamil
305-860-3740
mrodriguez@bermelloajamil.com.
Project Downloads
Contact Address
Florida Department of Transportation
District Six Construction Office
1000 NW 111 Avenue
Miami, FL 33172
Phone: 305-470-5349
Toll Free: 1-866-513-7623
Chris Tavella, P.E.
District Design Engineer
Roadway Design Engineer
Vacant
Teresita Alvarez, P.E.
District Six Consultant Management Engineer
Maribel Lena
District Six Public Information Officer