South Florida Roads (Miami-Dade and Monroe Counties)
error icon
Sample text Sample text

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for a roadway improvement project along State Road (SR) 5/US 1/S Dixie Highway from Bailes Road to SW 214 Street, in Miami-Dade County. 

WORK TO BE PERFORMED:

  • Repaving and restriping the roadway
  • Upgrading traffic lights at the following intersections: SW 224 Street, SW 220 Street and SW 216 Street
  • Improving pedestrian signage, curb ramps and pavement markings

MAINTENANCE OF TRAFFIC:

Temporary lane closures during non-peak hours will have minimal effects on traffic. Access to adjacent neighborhoods and businesses will be maintained during construction. Pedestrian traffic will be impacted. Detours will be established.

Project At-A-Glance
 
map
Construction Start Date
February 2021

Construction Cost
$2.6 million

Lengths and Limits
SR 5/US 1/S Dixie Highway from Bailes Road to SW 214 Street

FDOT Project Manager
Auraliz Benitez, P.E.


Consultant Design Project Engineer
Raymond Valido, P.E.

Wantman Group, Inc.


Community Outreach Specialist
Rodolfo Roman

Infinite Source Communications

O: 305-470-5477

Rodolfo.Roman@dot.state.fl.us