South Florida Roads (Miami-Dade and Monroe Counties)
error icon
Sample text Sample text

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for an intersection improvement project at SR 5/US 1/South Dixie Highway and SW 112 Avenue, in Miami-Dade County
 
WORK TO BE PERFORMED:
  • Enhancing traffic signals by adding dedicated left turn signals from US 1 to SW 112 Avenue in both directions
  • Adding a second left turn lane from US 1 to SW 112 Avenue
  • Repaving and restriping the intersection
  • Installing high emphasis crosswalks and pedestrian signs at the intersection near Southland Mall
  • Reconstructing the raised island at the intersection
  • Widening the southbound lanes along SR 5/US 1/ South Dixie Highway just south of the intersection

MAINTENANCE OF TRAFFIC (MOT):

It may be necessary to close sidewalks, travel lanes and detour traffic temporarily during construction. These closures and detours will be scheduled to minimize impacts to motorists and pedestrians. 

Project At-A-Glance
 
map
Construction Start Date
July 2021

Construction Cost
$1 million

Lengths and Limits
SR 5/US 1/South Dixie Highway and SR 989/ SW 112 Avenue/Allapattah Road

FDOT Project Manager
Elsa Riverol, P.E.


Consultant Design Project Engineer
Soheila Sadough, P.E.

ASA Consultants, Inc.


Community Outreach Specilist
Rodolfo Roman

Infinite Source Communications Group

O: 305-470-5477

Rodolfo.Roman@dot.state.fl.us