FIN NO: 250236-1-52-1
WPI NO. N/A

Project Limits

5 Street to Lincoln Road

Municipalities

City of Miami Beach

Project Summary

Repaving and restriping the road
• Installing a traffic signal at 12 Street
• Widening the lanes between 15 Street and 16 Street
• Reconstructing sidewalks 
• Upgrading signage, including electronic signs at 16 Street and at Lincoln Road
• Upgrading pedestrian ramps, countdown pedestrian signals and crosswalks
• Upgrading drainage
• Relocating utilities, if necessary
• Providing exclusive left turn lanes at the intersections
• Installing sidewalk curb extensions at each intersection
• Upgrading lighting
• Installing decorative stamped asphalt crosswalks
• Installing side street name pavers on the sidewalk
• Installing landscaping and irrigation at the intersection side walk extensions
 

Anticipated Construction Start Date: May 2013

Construction Cost:$4.3 million

map

Project Team

FDOT Project Manager

Heidi Solaun, P.E.

 

Public Information Specialist

Amparo Vargas

Infinite Source Communications

Office: 305- 470-5349
Fax: 305-470-5366
Email: Amparo.Vargas@dot.state.fl.us

 

Contact Address

Florida Department of Transportation
District Six Construction Office
1000 NW 111 Avenue
Miami, FL 33172

Phone: 305-470-5349
Toll Free: 1-866-513-7623

lines

Chris Tavella, P.E.

District Design Engineer

Daniel Iglesias, P.E.

District Roadway Design Engineer

line

Teresita Alvarez, P.E.

District Six Consultant Management Engineer

Maribel Lena

District Six Public Information Officer