The Florida Department of Transportation (FDOT) is developing the design for a roadway project located at the intersection of SR 934/NW 79 Street at NW 32 Avenue, in Miami-Dade County.
WORK TO BE PERFORMED:
- Installing new traffic signals on the northwest and southeast corners
- Adding and upgrading pedestrian signals, signage, and crosswalks
- Reconstructing curb ramps
- Upgrading traffic signal operation
- Repaving and restriping the existing pavement within the intersection
MAINTENANCE OF TRAFFIC
During construction, temporary lane closures during non-peak hours and detours may affect traffic. Pedestrain detours will be establised with clear signage. Access to adjacent residences will be maintained.
Construction Start Date |
---|
December 2024 |
Construction Cost |
$550,000 |
Lengths and Limits |
State Road (SR) 934/NW 79 Street at NW 32 Avenue |
FDOT Project Manager |
Jose Barrera, P.E. |
Consultant Design Project Engineer |
Ramone Tesone, P.E., Alvarez Engineers |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications Group O: 305-470-5477 C:786-519-7160 |