South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for three roadway resurfacing projects along State Road (SR) 7/US 441/NW 7 Avenue from north of SR 934/NW 79 Street to south of Biscayne Canal, in Miami-Dade County.

WORK TO BE PERFORMED

  • Repaving and restriping the roadway
  • Eliminating outside lanes and replacing with on-street parking and bicycle lanes
  • Reconstructing sidewalks at signalized intersections
  • Improving existing traffic signals
  • Upgrading pavement markings, pedestrian signs and signals
  • Enhancing existing lighting system at all signalized intersections
  • Modifying existing medians and installing medians
  • Adding curb extensions
     

MAINTENANCE OF TRAFFIC (MOT)

Temporary lane closures during non-peak hours will have minimal effects on traffic. Access to all properties along NW 7 Avenue will be maintained at all times.

Project At-A-Glance
 
map
Construction Start Date
August 2018

Construction Cost
$10 million

Lengths and Limits
SR 7/US 441/NW 7 Avenue from north of SR 934/NW 79 Street to south of Biscayne Canal

FDOT Project Manager
Ken Jeffries



FDOT Project Manager
Natalie Garganta, P.E.



FDOT Project Engineer
Lourdes Encarnacion


Community Outreach Specialist
Charesse Chester

Creativision MEDIA

O: 305-944-7564

cchester@creativisionmedia.com


Community Outreach Specialist
Rodolfo Roman

Infinite Source Communications

O: 305-470-5477
Rodolfo.Roman@dot.state.fl.us