South Florida Roads (Miami-Dade and Monroe Counties)
error icon
Sample text Sample text

EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo - link to the FDOT website
Florida Department of

TRANSPORTATION

South Florida Roads (Miami-Dade and Monroe Counties)

 
Welcome
 

The Florida Department of Transportation (FDOT) is developing the design for an intersection improvement project along State Road (SR) 5/US 1/Biscayne Boulevard from SE 2 Street to NE 11 Terrace, in Miami-Dade County.

WORK TO BE PERFORMED:

  • Upgrading overhead sign structures at the intersection of Biscayne Boulevard and NE 5 Street/Port Boulevard
  • Repaving and restriping NE 5 Street from NE 2 Avenue to Biscayne Boulevard
  • Widening the median at the intersection of Biscayne Boulevard and SE 1 Street
  • Upgrading roadway signage
  • Repaving and restriping the intersection of Biscayne Boulevard at SE 1 Street and Port Boulevard
     

MAINTENANCE OF TRAFFIC (MOT):

Temporary lane closures during non-peak hours will have minimal effects on traffic. Access to businesses and pedestrians will be maintained at all time.  

Project At-A-Glance
 
map
Construction Start Date
August 2019

Construction Cost
$1.8 million

Lengths and Limits
SR 5/US 1/Biscayne Boulevard from SE 2 Street to NE 11 Terrace

FDOT Project Manager
Adriana Manzanares, P.E.


Consultant Design Project Engineer
Eithel Sierra, P.E.

A&P Consulting Transportation Engineers, Corp.


Community Outreach Specialist
Rodolfo Roman

Infinite Source Communications

O: 305-470-5477

Rodolfo.Roman@dot.state.fl.us