- Reconstructing the road within project limits
- Raising the road
- Widening existing parking lanes from 43 Street to Pine Tree Drive
- Installing new signs and pavement markings including bicycle facilities
- Installing new storm water drainage system including curb inlets and three pump stations (one will be designed and built by the City of Miami Beach), with outfalls into the Intracoastal Waterway
- Upgrading roadway lighting to LED
- Upgrading signal mast arms
- Upgrading sidewalks and pedestrian ramps to meet current standards
SR 907/Alton Road from south of 43 Street to north of West 48 Street (430444-1-52-01): Scheduled to begin construction in the spring of 2030.
SR 907/Alton Road from north of West 48 Street to north of 57 Street(430444-4-52-01): Scheduled to begin construction in late 2030.
SR 907/Alton Road from north of 57 Street to Allison Road (430444-2-52-01): Scheduled to begin construction in late 2030.
ESTIMATED CONSTRUCTION COST*
- SR 907/Alton Road from south of 43 Street to north of west 48 Street (430444-1-52-01): $30 million
- SR 907/Alton Road from north of West 48 Street to east of Allison Road (430444-2-52-01): $36 million
- SR 907/Alton Road from north of 57 Street to Allison Road (430444-2-52-01): $.35 million
*Cost is subject to change.
Construction Start Date |
---|
October 2030 |
Construction Cost |
$95 million |
Lengths and Limits |
SR 907/Alton Road from south of 43 Street to east of Allison Road |
FDOT Project Manager |
Humberto Gomez, P.E. |
Consultant Design Project Engineer |
Edwin Mojena, P.E. H.W. Lochner, Inc. |
Community Outreach Specialist |
Rodolfo Roman Infinite Source Communications O: 305-470-5477 Rodolfo.Roman@dot.state.fl.us |