SR 5/US1 from Mile Marker 121.75 to Mile Marker 124.5

FIN NO: 249856-2-52-01/249856-2-56-01
WPI NO. T6210

Project Limits

S.R. 5/U.S. 1 from Mile Post 8.75 (Mile Marker 121.75) to Mile Post 11.269 (MM 124.5) on Miami-Dade County

Project Summary

The project will reconstruct the existing two-lane roadway to include: the addition of a 40' span wildlife crossing; the construction of a 6' x 10' box culvert structure to serve as wildlife crossing; the installation of eight 24" cross drain equalizer pipes to restore water flow to the natural wetland areas; the installation of a median barrier wall; six-foot inside shoulders, north and southbound 12-foot travel lanes, a northbound 12-foot shoulder (10-foot paved, two-foot unpaved), a southbound 10-foot shoulder (six-foot paved, four-foot unpaved); and, one-mile passing lanes at MM 121 to MM 122.

Start Date: September 2009

Completion: June 2011

Construction Cost:$15.8 million

map

Project Team

FDOT South Miami-Dade Resident Engineer

Erik Padron, P.E.

 

FDOT Construction Project Manager

Jacqueline Sequeira, P.E.

 

Construction Consulting Engineering and Inspection (CCEI)

Parsons Brinckerhoff, Inc.


 

Contractor

Central Florida Equipment

 

Public Information

Call or email

Parsons Brinkerhoff

305-481-1186
PBUS1@bellsouth.net

 

Project Downloads

Contact Address

Florida Department of Transportation
District Six Construction Office
1000 NW 111 Avenue
Miami, FL 33172

Phone: 305-640-7400
Toll Free: 1-866-513-7623

lines

Mark Croft, P.E.

District Six Construction Engineer

Vacant

Assistant District Construction Engineer

Ivan Hay, P.E.

North Miami-Dade Resident

Engineer

line

Erik Padron, P.E

South Miami Dade Resident Engineer

Isa Nuñez, P.E.

Construction Major Projects Program Manager

Kathy Yeomans

District Six Construction Public Information

Project Manager