SR 5/South Dixie Hwy/US 1 from SW 284 St to SW 304 St

FIN NO: 410625-1-52-01
WPI NO. N/A

Project Limits

From SW 284 St to SW 304 St

Municipalities

Unincorporated Miami-Dade County

Project Summary

The project includes rebuilding the roadway; widening sections of the roadway; widening the bridge over the C-103 canal; restoring the C-103 canal banks; installing median traffic separators at various locations; installing a water main across the C-103 canal; installing new sidewalks and driveways; leveling existing sidewalks and driveways to match the roadway; installing curb and gutter; upgrading lighting, traffic and pedestrian signals; and repaving and restriping the roadway.

Start Date: February 2011

Completion: November 2012

Construction Cost:$7.2 million

map

Project Team

FDOT South Miami-Dade Resident Engineer

Erik Padron, P.E.

 

FDOT Project Manager

Jacqueline Sequeira, P.E.

 

Construction Consulting Engineering and Inspection (CCEI) Project Engineer

Art Perez, P.E.

Pinnacle Consulting Enterprises, Inc.

 

Constractor

Atlantic Civil, Inc.

 

Public Information Specialist

Heather M. Leslie

Cunningham Group, Inc.

305-640-7462

Heather.Leslie@dot.state.fl.us

 

Contact Address

Florida Department of Transportation
District Six Construction Office
1000 NW 111 Avenue
Miami, FL 33172

Phone: 305-640-7400
Toll Free: 1-866-513-7623

lines

Mark Croft, P.E.

District Six Construction Engineer

Vacant

Assistant District Construction Engineer

Ivan Hay, P.E.

North Miami-Dade Resident

Engineer

line

Erik Padron, P.E

South Miami Dade Resident Engineer

Isa Nuñez, P.E.

Construction Major Projects Program Manager

Kathy Yeomans

District Six Construction Public Information

Project Manager