FIN NO: 414624-1-52-01and 405578-3-52-01
WPI NO. N/A

Project Limits

NE 15 Street to NE 35 Terrace / NE 35 Terrace to NE 38 Street

Project Summary

The intent of the project is to enhance the area by: reconstructing the roadway; replacing the drainage and water main systems; reconstructing the sidewalks, driveways and curb ramps; replacing curb and gutter at several locations; upgrading lighting, traffic and pedestrian signs and signalization; installing new landscaping and irrigation; and repaving and restriping the roadway, including from NE 35 Street to NE 38 Street.

Start Date: August 2009

Completion: August 2011

Construction Cost:$16 million

map

Project Team

FDOT North Miami-Dade Resident Engineer

Ivan Hay, P.E.

 

Construction Consulting Engineering and Inspection (CCEI)

Enrique Tamayo, P.E.

Tamayo Engineering, LLC

305-762-7177

 

Contractor

American Engineering and Development Corporation

 

Public Information Specialist

Monica Diaz

The Cunningham Group

Monica@publicinvolvement.com
305-215-9777

 

Contact Address

Florida Department of Transportation
District Six Construction Office
1000 NW 111 Avenue
Miami, FL 33172

Phone: 305-640-7400
Toll Free: 1-866-513-7623

lines

Mark Croft, P.E.

District Six Construction Engineer

Mario Cabrera, P.E.

Assistant District Construction Engineer

Ivan Hay, P.E.

North Miami-Dade Resident

Engineer

line

Erik Padron, P.E

South Miami Dade Resident Engineer

Isa Nuñez, P.E.

Construction Major Projects Program Manager

Kathy Yeomans

District Six Construction Public Information

Project Manager